Power
New innovative AC Source Rack Mount High Voltage Power systems
UltraVolt, Inc. announced today its newest high-voltage power systems – the HV Rack Advanced AC and HV Rack Advanced AC 3Phase Series. These unique systems are fully adjustable AC sources with up to three phases, offer currents up to 600A per phase, provide a digital display of all parameters, and include features such as user interface control and flicker simulation.
The The HV Rack Advanced AC and HV Rack Advanced AC 3Phase Series generate any waveforms - including sine, square and triangle voltages - that users input into an external oscillator. User-defined wave forms can be read from an SD card via the external SD Card slot. Additionally, the user can access permanently stored waves.
Each system can be equipped with a variety of interfaces to provide universal connectivity and control including RS-232, RS-485, USB, IEEE 488, and LAN. The display automatically measures the output voltage, RMS current, average and peak current, active power, reactive power, apparent power, power factor and crest factor simultaneously. These systems are also available with isolated, self-calibrating 5V or 10V analog interfaces.
UltraVolt’s new systems are ideal for laboratory and field testing. One function – flicker simulation – simulates brief power outages, which are one of the most common causes of machine failures. Power interruption often causes systems to shut down and can lead to a shift of phase angles. HV Rack Advanced AC and HV Rack Advanced AC 3Phase systems offer the possibility of individual phase angles with 0.1% accuracy independent from each other, making them able to simulate faults in the network.
“Companies and institutions world wide have found existing AC power sources limited in capability,” stated James Morrison, CEO & Cofounder. “The new UltraVolt HV Rack Advanced AC single phase and 3 phase power systems feature higher output voltages and frequency ranges, expanding capability in a form to meet critical project requirements. Systems are deliverable in 4 to 6 weeks and made to application requirements!”