Analysis
NI LabVIEW Monitors Structural Health of Summer Olympic Venues in Beijing
National Instruments has announced the China Earthquake Administration (CEA), the leading governmental body managing the country’s earthquake preparedness and disaster mitigation, selected a structural health monitoring (SHM) solution developed by National Instruments Alliance Partner CGM Engineering, Inc., based on the NI LabVIEW graphical system design platform and NI CompactRIO programmable automation controllers. The systems are designed to aid engineers in conducting structural health research on seven recently constructed megastructures in China including both of the main venues for the 2008 Summer Olympics – the Beijing National Stadium and the National Aquatics Centre.
“TThe nine 64-channel and two 36-channel SHM systems each contain multiple CompactRIO controllers that directly connect to accelerometers for vibration measurements and an external GPS receiver for inter-chassis synchronisation. Within each chassis, the LabVIEW FPGA Module is used to synchronise each measurement channel to within ±10 microseconds of the GPS-disciplined clock. The LabVIEW Real-Time Module is also used to program user-configurable filtering to prevent unwanted noise from interfering with the low-frequency measurements being acquired. Each system is encapsulated in a rugged NEMA enclosure, which permits the unit to operate in high humidity and temperatures ranging from -40 C to 70 C.
The SHM system performs continuous, real-time monitoring at each location, and engineers can remotely access the locally stored data from anywhere in the world via secure Internet connections. Additionally, engineers can configure the systems using either a single or multivariate architecture to send e-mail notifications when events occur.
The CEA selected this system based on NI technology over other solutions because it offers continuous, real-time monitoring, time-based GPS synchronisation and the highest channel count for the lowest cost. The technology also provides a simple, out-of-the-box setup and a variety of I/O options that can be quickly and easily reconfigured to meet changing system requirements.
In addition to the Olympic venues, the SHM systems are deployed in the 104-story World Trade Centre in Shanghai, 66-story Park Hyatt Hotel complex in Beijing, 240 m concrete arch dam in Ertan, 8266 m cable-stayed bridge in Shan-Tou and base-isolated CEA data centre in Beijing. Ultimately, the data collected from this research will be used to improve the structural integrity of future buildings and reduce the number of lives lost from catastrophic events.